Chapter 10

Team and responsibilities

Four roles, who does what, effort and working practices.

The project needs four people with complementary skills. This chapter defines the four roles, what each person is responsible for, how effort is distributed and how the team works together. Names are entered when the positions are filled; throughout the report the roles are referred to by their codes.

10.1Roles

Table 10.1.The four roles.

CodeRole and profileResponsibilitiesOwnership
PIPrincipal investigator (physicist)
Electromagnetic modelling, measurement design and data analysis; scientific Python; laboratory practice.
Scientific direction and project management (WP0). Forward models and calibration against exact solutions (WP2). Tensor inversion and radar analysis (WP4, WP5). Fusion method, field-trial design and publication (WP6). Chairs reviews and decision gates.Leads WP0, WP2, WP6
13 tasks
Owns D0.1, D2.1, D3.2, D4.2, D5.2, D6.2
HWHardware engineer (analog and RF)
Analog circuit design, PCB layout, coil winding, RF measurement with a vector network analyser, mechanical fabrication.
Coils, transmit drivers, preamplifiers and nulling (WP1, WP2). Sensor pole mechanics (WP3). Three-axis coil head (WP4). Antennas, amplifiers and radar front end (WP5). Safety officer; places objects for blind tests.Leads WP1, WP5
11 tasks
Owns D1.2, D2.2, D5.1
SWEmbedded and software engineer
Embedded C/C++, real-time acquisition, Linux, Kalman filtering, software engineering practice.
Codec bring-up and host streaming (WP1). Acquisition software. GNSS, IMU and timing integration and the fusion filter (WP3). Radar sweep software (WP5). Live map, data pipeline, repository and public release (WP6).Leads WP3
10 tasks
Owns D1.1, D3.1, D6.3
DSData scientist and field engineer
Machine learning, statistics, simulation, experimental design; field work.
Test objects and acquisition support (WP1). Ground survey (WP2). Camera odometry (WP3). Simulator, dataset collection, classifiers and blind evaluation (WP4). Sensor fusion and dataset release (WP6).Leads WP4
7 tasks
Owns D4.1, D4.3, D6.1

10.2Responsibilities by work package

Each work package has one accountable lead and at least one second person who reviews and can take over. The matrix uses the usual RACI convention: R responsible (does the work), A accountable (owns the result and signs off), C consulted, I informed.

Table 10.2.Responsibility matrix by work package.

WPTitlePIHWSWDS
WP0Project managementA/RCRC
WP1Bring-up and receive chainCA/RRR
WP2Static induction rig and calibrationA/RRCR
WP3Positioning and timing platformRRA/RR
WP4Full tensor, dataset and classificationRRCA/R
WP5Radar subsystemRA/RRC
WP6Fusion, field trials and releaseA/RRRR

10.3Effort

Each person works full time for twelve months, giving 48 person-months in total. The table shows the planned distribution. It is used to cost the work packages in Chapter 11.

Table 10.3.Effort in person-months.

RoleWP0WP1WP2WP3WP4WP5WP6Total
PI1.50.53.01.02.01.03.012.0
HW0.33.02.51.21.53.00.512.0
SW0.32.50.54.50.51.72.012.0
DS0.20.81.51.55.00.52.512.0
Total2.36.87.58.29.06.28.048.0

10.4Focus by quarter

Table 10.4.Main activities of each role per quarter.

RoleQ1 (weeks 1–13)Q2 (14–26)Q3 (27–39)Q4 (40–52)
PIForward model, calibration plan, procurementCalibration against theory, M1 reviewTensor inversion, radar analysisFusion, field trials, paper
HWCoils, preamplifiers, TX driverNulling, pole mechanics, tensor headRadar antennas and amplifiersField hardware, documentation
SWCodec bring-up, acquisition softwareRTK, timing, sensor fusionRadar software, data pipelineLive map, release
DSAcquisition software, test objectsGround survey, camera odometrySimulator, dataset, classifierBlind test, fusion, dataset release

10.5Working practices

10.6Substitution

If one person becomes unavailable, the second owner of each of that person's tasks (the RACI "R" entries of another role) continues the work. For PI, the DS role takes over analysis and SW takes over coordination. For HW, PI covers measurements and an external contractor may be engaged for PCB work (contingency budget). The written lab log and decision log make such transfers possible without loss of information.